[vc_row][vc_column][vc_column_text][/vc_column_text][vc_column_text]Minsar has been involved as the Civil and Structural Engineer in the development of many beach resorts and high-rise hotels throughout Malaysia, either under fast-track turnkey construction or through the normal design, tender and construction supervision staged implementation. The following are a few typical projects the Engineers of Minsar have gained experience from:[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column width=”1/2″][vc_masonry_media_grid grid_id=”vc_gid:1543305698721-7f0bcaee-b40e-0″ include=”3584,3585,3586,3587,3588,3590,3591,3592,3593,3594,3595,3589″][vc_row_inner][vc_column_inner][vc_column_text]
  • 2 Blocks of 27-Storey Condominium with Strata title at Jalan Tg. Batu, Bintulu.
  • 34-Storey Condominium cum shopping Complex at Paragon Centre, Bintulu. Completed in 2016.
  • 27-Storey Condominium (Pinnacle) by Sarawak Land (Samling Group) at Tg. Batu, Bintulu.
  • 18-Storey Condominium for DD Plantation at Tg. Batu, Bintulu. Completed in 2016.
  • Twin 18-Storey & a 13-Storey Saffire Condominium with 3-level basement carpark at Jalan Batu Lintang for Naim Bhd, Kuching.
  • 22-Storey Promenade Hotel with basement carpark at Bukit Mata, Jalan Padungan, Kuching.
[/vc_column_text][/vc_column_inner][/vc_row_inner][/vc_column][vc_column width=”1/2″][vc_column_text]
  • Holiday Inn, Miri (200 Rooms). Completed in 1988.
  • Kingwood Inn, Kuching (105 Rooms), Completed in 1989.
  • Santubong Resort Kuching (380 Rooms) and Golf Club House. Completed in 1990.
  • Sheraton Beach Resort, Langkawi (350 Rooms). Completed in 1991.
  • Sheraton Resort Labuan (250 Rooms). Completed in 1992.
  • De–LIMA and Mega Budget Hotel, Langkawi (totalling 2,000 rooms). Completed in 1992.
  • Langkasuka Beach Resort, Langkawi (250 Rooms). Completed 1993.
  • 14-Storey Swiss Inn Hotel (200 Rooms) with 3-Storey basement carparks, George Town, Penang.
  • Swiss Inn Kuantan, a Beach Resort Hotel Pahang (300 Rooms). Completed in 1997.
  • Beverly Hotel, Bintulu, a Beach Front Hotel with 200 Rooms. Completed in 1997.
  • 15-Storey Hotel Complex, (RH Hotel) Sibu. Completed in 2006. (RM 55 mil.)
  • Damai Laut Resort Development, consisting of a Beach-side Resort, Bungalows, Holiday Apartments, Water Theme Park, and an 18-hole Golf Course. (RM 300 mil.)
  • 18-Storey Kingwood Hotel Extension and Water Front Development, Sibu (RM 90 mil.).
  • 23-Storey Pullman Hotel cum Commercial Centre at Jalan Mathis, Kuching with 350 Rooms (RM200 mil).
  • Four Points Sheraton Hotel, near Kuching International Airport, Kuching (250 Rooms).
  • 26-Storey Pullman Hotel and an 18-Storey Service Apartment in Miri Central Business District. Work completed 2016.
  • 3-Blocks of 18-Storey Bay Resort Condominiums and Service Apartments at Tanjung Lobang, Miri
  • 25-Storey Condominium at Sibu Town Square completed in 2016.
  • 12-Storey Hotel at Paragon Centre, Bintulu
[/vc_column_text][/vc_column][/vc_row]