NEW KUCHING-KOTA SAMARAHAN-ASAJAYA EXPRESSWAY (PHASE 1) SAMARAHAN DIVISION, SARAWAK (2007-2010)
Upgrading of existing 7.3km of 2 lane road to 4 lane dual carriageway, and construction of 5 new roundabouts with total cost of RM45 million. Application of successful ground treatment methods over soft clay throughout the expressway has mitigated long-term differential settlements resulting in an even pavement surface.
NORTHERN COASTAL HIGHWAY (NCH), LAWAS PACKAGE (SECTION 1), LIMBANG DIVISION (2020-)
Construction of 22.5km of new dual carriageway road to R5 standard from Mengkalap CIQ to Lawas Town including interchanges, flyovers, two (2) bridges crossing Sungai Trusan & Sungai Siang Siang and 6.3km access road to the new Lawas airport site.
JALAN OYA MUKAH BALINGIAN AND NEW BALINGIAN BRIDGE, MUKAH DIVISION, SARAWAK (2007-2010)
a) Construction of 31 km long road through – 22km over deep marine clay – 9km over deep highly compressible peat soil. A few kilometers of the road embankment were built on reclaimed riverbank tidal plains. Project sum of RM160 million.
UPGRADING OF JALAN PUJUT 7 TUDAN KUALA BARAM, TO DUAL CARRIAGEWAY ROAD, MIRI DIVISION, SARAWAK (2013)
Upgrading of 15km of existing road linking Pujut, Tudan and Kuala Baram to dual carriageway which includes a new parallel R.C. Bridge over Sg. Miri along Jalan Pujut 7.This section of upgraded road eventually becomes part of New Pan Borneo Highway.
UPGRADING OF JALAN SIBU-BINTULU FROM PERINDUSTRIAN KEMENA TO NEW BINTULU AIRPORT & A NEW PARALLEL BRIDGE OVER BATANG KEMENA, BINTULU DIVISION, SARAWAK (2005)
The construction of a new parallel two-lane bridge (Length: 465m), over Btg. Kemena, and the upgrading of 7km of existing R3 Road to dual-Carriageway R5 road standard at a cost of RM150 million. This road also eventually becomes part of New Pan Borneo Highway.
NEW JALAN RAYA SIMPANG PULAI LOGING GUA MUSANG KUALA BERANG (PAKEJ 4 POS BLAU KE KG. KUALA BETIS), PAHANG (2005-2008)
Construction of a new 20km long road to R3 standard (7m wide carriageway and 2m wide paved shoulders) through very hilly terrain with a value sum of RM60 million. A stretch of the road was changed to viaduct, basing on alternative design proposal.
UPGRADING OF SARAWAK 1ST TRUNK ROAD BETONG KAYU MALAM (SG. MALUPA TO SIMPANG ROBAN), SRI AMAN DIVISION, SARAWAK (2003-2005)
The upgrading of approximately 24km of existing tar sealed road through rolling to hilly terrain to a two lane single carriageway road with a total width of 7.3m, with a project sum of RM28 million.
PALOH – TANJUNG MANIS – BELAWAI COASTAL ROAD, MUKAH DIVISION
Major coastal road in Mukah Division linking Paloh, Tanjung Manis and Belawai, delivered as part of Minsar's Sarawak Coastal Road programme through marine clay and peat terrain.
JALAN SIBU – BAWANG ASSAN – SERENDANG, SIBU DIVISION
COST: RM222 MILLION
Part of the new access road between Sibu Town and Tanjung Manis (Bawang Assan – Serendang Section). Total length 11.34km.
PROPOSED TG. GELANG / KPG. SG. NAI COASTAL ROAD AT PULAU BRUIT, MUKAH DIVISION
Sarawak Coastal Road package for Kg. Gelang to Kg. Sg. Nai at Pulau Bruit, Mukah Division, approximately 20km in length.
MATU – KPG. TIAN – KPG. BAWANG COASTAL ROAD, MUKAH DIVISION
Coastal road linking Matu, Kampung Tian and Kampung Bawang in Mukah Division, forming part of the Sarawak Coastal Road network.
JALAN SG. BIDUT – KPG. SEBEDIL – KPG. BUNGAN KECIL, SIBU DIVISION
COST: RM126 MILLION
New road linking Sungai Bidut, Kampung Sebedil and Kampung Bungan Kecil. Total length 16km.
ROAD LINKING MILE 32 AND COASTAL ROAD (PACKAGE B), BINTULU DIVISION
COST: RM65 MILLION
Road linking Mile 32 and the Coastal Road for Bintulu Development Authority (BDA). Package B, 10km.
BARAM DAM ACCESS ROAD (PACKAGE B), MIRI DIVISION
Access road from Long Lama to the proposed Baram Dam site, Miri Division. Package B covers 64km (design only).
SABAH–SARAWAK LINK ROAD PHASE 2 (SSLR2) – PACKAGE 4
COST: RM1.8 BILLION
Sabah–Sarawak Link Road Phase 2 (SSLR2) Package 4. Approximately 100km of new highway linking Sarawak and Sabah.
UPPER RAJANG DEVELOPMENT AGENCY (URDA), KAPIT DIVISION
COST: RM460 MILLION
YEAR: 2018
URDA Package 2 — approximately 65km of hinterland roads in the Upper Rajang area covering Kapit, Belaga, Bukit Mabong, Kanowit and Song.
- Proposed New Road for Rh. Undi / Rh. Seli / Rh. Mamut / Rh. Ai, Antawau, Sg. Bena (RM50 mil)
- Proposed New Road from Antaroh Junction to Existing Logging Road (RM14 mil)
- Proposed New Road from Baleh Bridge / Rh. Belaja, Ng. Benin / SK. Ng. Pelagus / Pelagus Resort (RM115 mil)
- Proposed Upgrading of Existing Ex-Logging Road to Skim Tunoh, Melinau Kapit (RM55 mil)
- Proposed New Access Road to Tunoh Scheme (RM17.5 mil)
- Proposed New RC bridge across Batang Baleh at Nanga Gaat & New R1 Standard Road to Rumah Tungku (RM200 mil)
NORTHERN REGION DEVELOPMENT AGENCY (NRDA), LIMBANG DIVISION
COST: RM450 MILLION
YEAR: 2019
NRDA Package 1 — infrastructure in Limbang and Lawas Divisions, totalling approximately 36km.
- Proposed Upgrading of Existing and Construction of New Road from Kampung Pendam to Kampung Ipai, Limbang (RM47.5 mil)
- Proposed Construction of New Road from Rangau to Kuala Limbang, Limbang (In Progress)
- Proposed Construction of New Trailer Parking Centre, Limbang (In Progress)
- Proposed Construction of New Road from Bukit Lubok to Kampung Seberang Kedai, Limbang (RM24.3 mil)
- Proposed Upgrading of Existing Road from Nanga Medamit to Rumah Aling, Limbang (In Progress)
- Proposed Upgrading of Existing Tedungan–Pandaruan Road, Limbang (RM19 mil)
PROPOSED MATU / IGAN COASTAL ROAD, SARIKEI DIVISION
Sarawak Coastal Road from Matu to Igan, approximately 40km, serving Sarikei and Mukah Divisions.
PETRA JAYA BOULEVARD, KUCHING DIVISION
YEAR: 1996
Boulevard in Petra Jaya, Kuching. Completed in 1996.
IMPROVEMENT OF JALAN PALM / ONG KEE HUI, KUCHING DIVISION
COST: RM20 MILLION
YEAR: 1996
Improvement of Jalan Palm / Ong Kee Hui, Kuching, including road widening to dual carriageway. Completed in 1996. Related works were also carried out together with Satok Flyover.
JALAN HAB HALAL TANJUNG MANIS, MUKAH DIVISION
COST: RM77.5 MILLION
Road serving the Halal Hub at Tanjung Manis, Mukah Division. Total length 17.8km.
PROPOSED UPGRADING OF JALAN BATANG STRAP, SAPAK, ISU KE SIMPANG UBAH, SRI AMAN DIVISION
COST: RM35.8 MILLION
Proposed upgrading of Jalan Batang Strap, Sapak, Isu to Simpang Ubah, Sri Aman Division. Total length 6.7km.
PROJEK MENAIKTARAF JALAN BALAK KE PENEMPATAN SEMULA METALUN (FASA 6), KAPIT, SARAWAK
COST: RM85.8 MILLION
Upgrading of logging road to the Metalun resettlement (Phase 6) in Kapit, Sarawak. Total length 11.3km.
PROPOSED ROAD LINKING BATU KAWA TO STEPHEN YONG, KUCHING DIVISION
Proposed road linking Batu Kawa to Jalan Stephen Yong, Kuching Division. Total length 8.4km. Value to be advised.
SEMARIANG RIVERINE LOOP ROAD, KUCHING DIVISION
COST: RM84 MILLION
Semariang Riverine Loop Road, Kuching Division (turnkey). Total length 10.2km.